العربية
Breaking

Environmental Impact Assessment for Projects

                                                         Environmental Impact Assessment of Projects

By Engineer Yasmine Mostafa                                             Chemical Engineer

Environmental Impact Assessment:

Environmental Impact Assessment (EIA) for projects serves as a starting point for an integrated assessment that supports sustainable development goals, preserves natural and human capital, and enhances the sustainability of natural resources.

The process aims to identify the potential and proposed environmental and social impacts of a given project to determine options for minimizing environmental and social damage as much as possible. It provides an opportunity to pinpoint important environmental and social issues early in the proposal stage, addressing expected negative outcomes before final project decisions are made.

Objectives of Environmental Impact Assessment

  The goal of the Environmental Impact Assessment (EIA) process is to require new facilities to evaluate the environmental impact of projects and develop development programs rather than prevent or hinder them. This is achieved by identifying the negative and positive impacts of the project, working to maximize the positive impacts, and minimizing or avoiding the negative ones. It is also the study conducted to determine the potential or resulting environmental impacts of a project, along with the appropriate measures and means to prevent or reduce negative impacts and achieve or increase the project’s positive environmental returns in accordance with prevailing environmental standards.

    Medium-Term Objectives of Environmental Impact Assessment  Improving the environmental design of the proposed project, ensuring the efficient use of resources, identifying appropriate measures to mitigate expected environmental impacts of the project, and facilitating access to decision-making processes.

     Long-Term Objectives Protecting human health and safety, avoiding adverse changes and damages that reflect on the environment, protecting valuable resources, natural areas, and ecosystem components, and improving the social aspects of the proposed project.

    Classification of Large and Small Projects

Projects are classified into three different lists based on the severity of their potential impacts. The white list, designated as List (A), includes projects with minimal environmental impact. The grey list, designated as List (B), includes facilities with significant environmental impact or a significant event. Finally, the black list, designated as List (C), includes facilities with serious environmental impacts.

Legal Framework for the Environmental and Social Impact Assessment Process in Egypt:

Law No. 4 of 1994 on the Protection of the Environment stipulates that environmental impacts must be assessed for new projects or facilities, or for expansions and renewals of existing facilities, prior to the start of construction.

Law No. 4 of 1994 considers environmental impact assessment a licensing requirement. Therefore, any project that fails to conduct an EIA and comply with the conditions of the EIA approval will have its licensing procedures suspended until the facility completes the EIA process. This is governed by Articles 10, 11, 12, and 19 of the Executive Regulations of Law No. 4 of 1994, as amended by Prime Ministerial Decree No. 1741 of 2005, and amended by Law No. 9 of 2009 and its executive regulations.

 References

  1. Abdel Kader Sayegh et al., Fundamentals of Ecology, n.d., Wael Publishing and Distribution, Amman, Jordan, 2004.
  2. Mona Kassem, Environmental Pollution and Economic Development, 2nd ed., Al Dar Al Masriyah Al Lubnaniyah, Egypt, 2000.
  3. Samia Galal Saad, Integrated Environmental Management, n.d., Arab Organization for Administrative Development, Egypt, 2005.
  4. Mohammed Al-Sayrafi, Tourism and Environment: Impact and Interraction, 1st ed., Dar Al Hana for Artistic Binding, Cairo, Egypt, 2008.
  5. Mamdouh Salama Morsi Ahmed, Environmental Management for Environmental Impact Assessment of Projects, Assiut Journal of Environmental Studies, Environmental Affairs Department, General Directorate of Minia Governorate, Egypt, Issue 32, January 2008.

Next Topic:

8 Steps to Evaluate the Environmental Impact of New Projects and Industrial Facilities

Want a website as good as Ahram Scientific Magazine? Order your website design now via WhatsApp

Leave a Comment

Prove you are human: 3   +   3   =  

This site uses Akismet to reduce spam. Learn how your comment data is processed.

Saved articles